Pool Opening Form

Please enable JavaScript in your browser to complete this form.
Name
Address

Opening Date Preferences

Opening Options

Pool Opening Options

Option #1:

Full Service: Pool Tron to clean off cover, remove any debris and haul off site.  Pull cover, fold & leave or clean & store cover (see cover section.)  Attempt to remove stains at water level line & on pool deck.  Assemble all equipment.  Start pool to fill (off main drain if operational) (NOTE: Owner to turn off water when full.)  Return day 2 to open skimmers, clean pool, make any needed repairs to system, heater or cleaner.  Check and balance water chemistry and stabilize pool water.

Option 2: 

One Day Service: Owner to have cover off of pool and pool full.  (NOTE: No real cost savings will be noticed unless pool is full to normal operating level – midway into skimmer box.)  Pool Tron to assemble all equipment and check for any needed repairs to system, heater or cleaner.  Open skimmers, clean pool, start up system, check and balance water chemistry and stabilize pool water.  (NOTE: Please make sure no staining has occurred during the winter before filling the pool with water.  The water line stain CAN’T be cleaned once the pool is full.) 

Option 3: 

Limited Bid Opening Package – Cost Savings Flat Fee: Owner to have cover off of pool and pool full to normal operating level (midway into the skimmer box.) Pool Tron to assemble all equipment, start up system, open skimmers, clean pool and shock pool with liquid chlorine.  (NOTE: This flat fee doesn’t include any repairs water balance, removal of stains, cleaning of deck, return trips, stabilizer and storing cover. If the system is not able to run due to needed repairs, the customer will be contacted for authorization.  All work associated with repair will be billed on a time and materials basis in addition to the flat fee.)

Option 4: 

Drain & Acid Wash Package – Flat Fee:  Pool Tron to clean off cover, remove any debris and haul off site.  Pull cover, fold & leave or clean & store cover (see cover section.)  Drain pool, acid wash all interior surfaces, assemble all equipment & check for any needed repairs to system, heater or cleaner (extra if needed.)  Clean and remove any stains on pool deck & start pool to fill.  Return 2nd day to start pool system off main drain (if main drain is operational.)  Remove any stains while pool is filling.  Return 3rd day open skimmers, clean pool, check and balance water chemistry & add stabilizer. (NOTE: Pool Tron will take every precaution to prevent pool from floating but is not responsible.)

Pool Cover

Regular Maintenance / Cleaning

Navigate

ThemeREX © 2024. All rights reserved.