Serving Eastern Missouri and Illinois

(314) 428-1971

Pool Opening

Option #1 – Full Service: Pool Tron will clean off the cover, remove any debris and haul it off site. Pull the cover, fold & leave or clean & store cover (see cover section).  Stains will be removed at the water level line & on pool deck. Assemble all equipment. Start pool to fill off main drain (if operational) (NOTE: Owner to turn off water when full). Return 2nd day to open skimmers, clean pool & make any needed repairs to system, heater or cleaner. Check and balance water chemistry. Stabilize the pool water. (*Billed at time & material with 2 hour minimum charge*).

 

Option #2 – One-Day Service: Owner will have the cover off of the pool and pool full. (NOTE: No real cost savings will be noticed unless pool is full to normal operating level (midway into the skimmer box). Pool Tron will assemble all equipment and check for any needed repairs to system, heater or cleaner. Open skimmers, clean pool, start up system, check, balance water chemistry, and stabilize pool water. (NOTE: Please make sure no staining has occurred during the winter before filling the pool with water.  The water line stain CANNOT be cleaned once the pool is full. (*Billed at time & material with 2 hour minimum charge*). 

 

Option #3 – Limited Bid Opening Package – Cost Savings Flat Fee $350.00: Owner will have the cover off of the pool and pool full to normal operating level (midway into the skimmer box). Pool Tron will assemble all equipment, start up system, open skimmers, clean  and shock the pool with liquid chlorine. (NOTE: This flat fee doesn’t include any repairs, water balance, and removal of stains, cleaning of deck, return trips, stabilizer and storing cover. If the system is not able to run due to repairs required, the customer will be contacted for authorization. All work associated with repair will be billed on a time and material basis in addition to the flat fee).

 

Option #4 – Drain & Acid Wash Package – Flat Fee $1,900.00:  Pool Tron will clean off the cover, remove any debris and haul off site. Pull the cover, fold & leave or clean & store cover (see cover section). Drain pool, acid wash all interior surfaces, assemble all equipment, clean/ remove any stains on pool deck & start filling the pool. Return 2nd day to start pool system off main drain (if main drain is operational), check for any needed repairs to system, heater or cleaner (extra if needed) and remove any stains while pool is filling. Return 3rd day to open skimmers, clean pool, check, balance water chemistry & add stabilizer. NOTE: We will take every precaution and do everything possible to prevent pool floatage, but cannot and will not be responsible if pool floats.